Thanks to the generosity of the Ludlow Food Festival who have provided funding for additional rainwater catchment facilities, members have been busy during April taking delivery of materials and preparing a solid base for additional water storage containers.
Colin kindly gave permission for the delivery vehicle to gain access via the private road adjoining Newton so that paving slabs and blocks could be delivered onto the North perimeter of the Community Garden.
Once delivered, all that was required was to move the blocks and paving slabs close to their final position in the former dry compost area.
The next stage in the preparation for the installation of additional water storage containers was to position and level the paving slabs and install the support blocks – described in the next post: Additional Rainwater Catchment – Part 2.